Logo

MonoCalc

/

Concrete Calculator

Construction

Units

Sets the result unit, bag sizes and defaults for new pours. Existing pours keep the units you entered.

Measure in several places; subgrade is never perfectly flat.
Identical pieces, e.g. 6 for six matching piers.

Thickened slab edge? Add it as an extra Footing pour.

10 ft4 in10 ft

Not to scale

Volume = L × W × T

1.23 yd³

1 of 20 pours

Waste allowance

Waste covers spillage, uneven subgrade, over-dug trenches and form bulge. Running short in the middle of a pour is much worse than having a few bags left over.

Buying options & prices

Prices are optional; options without a price show quantities only. The currency only changes the symbol, nothing is converted.

Pre-mix bags, standard concrete mix (typical yield, check your bag)

$
Yields 0.60 ft³
$
Yields 0.45 ft³
$
Yields 0.30 ft³

Ready-mix

Check with your supplier; increments and minimum orders vary.
$
$
Optional flat fee, added when a price is set.

Results

Concrete to buy for

1.36 yd³

36.7 ft³ · 1.04 m³

Includes 10% waste (0.12 yd³). Without waste: 1.23 yd³.

Where the concrete goes

  • 1. Pour 1

    1.23 yd³ · 91%

  • Waste (10%)

    0.12 yd³ · 9%

What to buy

OptionBuyHaul weightSpareCost

80 lb bags

0.60 ft³ per bag · typical yield, check your bag

62 bags4,960 lb0.5 ft³ spare

60 lb bags

0.45 ft³ per bag · typical yield, check your bag

82 bags4,920 lb0.2 ft³ spare

40 lb bags

0.30 ft³ per bag · typical yield, check your bag

123 bags4,920 lb0.2 ft³ spare

Ready-mix

Ordered in 0.25 yd³ steps · check with your supplier

Order 1.50 yd³0.14 yd³ spare

Add prices under Buying options to compare costs.

Approximate weight of 1.36 yd³ of concrete

≈ 5,500 lb (2.8 US tons) (approx.)

Based on about 150 lb/ft³ (2,400 kg/m³). Normal-weight concrete is roughly 140–150 lb/ft³ (2,240–2,400 kg/m³), depending on the mix and reinforcement.

Bags or a truck?
Above about a cubic yard, most people order ready-mix or rent a mixer. That's 45+ 80-lb bags to mix by hand.

About This Tool

Concrete Calculator – How Much Concrete You Need and What to Buy

Ordering concrete is one of the few DIY jobs where a small arithmetic mistake is expensive either way. Too little and you are left with a half-finished slab and a cold joint; too much and you are paying for a truck load you can't use. This concrete calculator works out the volume of slabs, footings, round and square columns, solid stairs and curb & gutter, adds a waste allowance, and then turns the total into something you can actually buy: a number of pre-mix bags or a ready-mix order in cubic yards or cubic metres.

How Concrete Volume Is Measured

Concrete is sold by volume, so every job comes down to length × width × depth. A slab 10 ft long, 10 ft wide and 4 in thick is 10 × 10 × 0.333 = 33.3 ft³, or about 1.23 yd³. The main trap is mixed units: plans give lengths in feet and thicknesses in inches. The calculator lets you pick a unit for every single measurement and converts everything with exact factors (1 in = 25.4 mm), so you never have to divide by 12 in your head.

Other shapes follow the same idea. A round pier is π × (d/2)² × height. Solid stairs poured on grade are a stack of blocks, one per riser, plus an optional landing at the top. A curb and gutter is an L-shaped cross-section (the curb plus the gutter flag) multiplied by its length. Add each part of the job as its own pour, use the quantity field for identical pieces such as six deck piers, and the tool adds them up.

Why Concrete Is Sold by the Cubic Yard (or Cubic Metre)

In the United States, ready-mix plants batch and price concrete by the cubic yard: a cube 3 ft on each side, or 27 ft³. Most other countries use the cubic metre, which is about 1.31 yd³. Suppliers usually sell in steps such as a quarter of a yard, and many charge a short-load fee for small orders. The calculator rounds your total up to the order increment you enter, so the number you read out on the phone is the number you'll be billed for.

How Much Waste to Allow

No pour uses exactly the theoretical volume. Subgrade is never perfectly flat, trenches get over-dug, forms bulge under the weight of wet concrete, and some always ends up on the ground or left in the mixer. A waste allowance of 5–10% is typical, and this calculator defaults to 10%. Much more than 20% usually means a measurement is wrong rather than a genuinely messy job.

Running short is worse than having extra
If a load runs out halfway through a slab, the concrete already placed starts to set before the next batch arrives, leaving a weak, visible joint. A few spare bags cost far less than fixing that.

Bags or Ready-Mix?

Pre-mix bags are convenient for post holes, steps and small pads. A typical 80 lb bag of standard concrete mix yields about 0.60 ft³, so a single cubic yard takes 45 of them, which is over 3,500 lb of material to lift and mix by hand. As a rule of thumb, above roughly a cubic yard most people either rent a mixer or order ready-mix. Enter your local prices, including any delivery or short-load fee, and the calculator compares the options side by side. It rounds only once, on the final total, so several small pours never add up to extra bags you don't need.

Measuring Tips for an Accurate Estimate

  • Measure slab depth in several places. Check the corners and the middle of the excavation; a slab that is nominally 4 in thick can easily average 4.5 in.
  • Measure inside the forms, not the outside of the boards.
  • Count risers, not treads, for stairs, and include any top landing.
  • Check bag labels. Yields vary by product, especially for fast-setting and high-strength mixes; use the custom bag option with the yield printed on your bag.
Everything stays in your browser
All calculations run locally on your device. Nothing you enter is sent anywhere, and the tool uses no stored prices, so the costs you see are only the ones you type in.

Frequently Asked Questions

Is the Concrete Calculator free?

Yes, Concrete Calculator is totally free :)

Can I use the Concrete Calculator offline?

Yes, you can install the webapp as PWA.

Is it safe to use Concrete Calculator?

Yes, any data related to Concrete Calculator only stored in your browser (if storage required). You can simply clear browser cache to clear all the stored data. We do not store any data on server.

How does this concrete calculator work?

Enter the dimensions of each pour (slab, footing, column, stairs or curb), with its own unit for every measurement. The tool converts everything to cubic metres, totals the pours, adds your waste allowance, and only then rounds up once to whole bags or to the ready-mix order increment, because you can't buy part of a bag. It never rounds each pour separately, since that would overstate the order.

How many bags of concrete are in a cubic yard?

Using typical yields for standard concrete mix, a cubic yard takes about 45 × 80 lb bags (0.60 ft³ each), 60 × 60 lb bags (0.45 ft³) or 90 × 40 lb bags (0.30 ft³). A cubic metre is roughly 72 × 30 kg, 86 × 25 kg or 107 × 20 kg bags, based on yields derived from the same mix density. Yields vary by product, so check your bag and use the custom bag option if it differs.

How much extra concrete should I order?

Most people add 5–10%, and this calculator defaults to 10%. The allowance covers spillage, uneven subgrade, over-dug trenches and forms that bulge. Running short in the middle of a pour is far worse than having a few bags left over.

Should I use bags or ready-mix?

As a rule of thumb, bags suit small jobs such as post holes, steps and small pads. Above about a cubic yard (0.75 m³), most people order ready-mix or rent a mixer, because that is 45 or more 80 lb bags to mix by hand. Enter local prices, including any delivery or short-load fee, to compare the options for your job.

How do I measure stairs or a curb for this calculator?

For stairs, N is the number of risers, rise is the height of each step, run is the depth of each tread, and the landing is the flat area behind the top step (0 if there is none); the formula assumes solid stairs poured on grade. For curb and gutter, curb height runs from the bottom of the gutter flag to the top of the curb, and gutter width is measured outward from the curb face, so the two parts don't overlap.

What's the difference between cubic yards and cubic metres?

A cubic yard is a cube 3 ft on each side: 27 ft³, or about 0.765 m³. A cubic metre is about 1.31 yd³ or 35.3 ft³. US ready-mix is usually sold by the cubic yard and most other countries sell by the cubic metre, so the calculator shows the total in both, plus cubic feet.